Connect any AI agent, personal assistant, or coding tool via MCP or HTTPS
Connect →
TELEON ARCHITECTURE MASTER BLUEPRINT & SEED PORTAL
← All 320 Atomic Work Queues STAGE 55 OF 320 cad_manufacturing_gate Async enhancement

CoT Faithfulness Audit (aq55_audit_cot_faithfulness_and_divergence)

Audits reasoning traces for exact SWHID byte-span grounding, counterfactual option-swap invariance, and first-divergence-step localization.

Byte-Span GroundingOrder-Swap CheckO(log S) Divergence
TIER 1 · DETERMINISTIC (0 MODEL CALLS)

0-Call Engine & Verification Slot

SWHID byte-slice verifier & binary-search divergence locator

Substrate: db_atomic · p99 Claim Target: ≤ 5 ms · Phase: 53 - 56 Multi-Model Voting, Conflict Resolution, CoT Audit & Proof Certificates

AI Agent (1..6)

Model-Guided Escalation & Synthesis Role

Counterfactual faithfulness & unstated-hint auditor

5-Role Component Pod: 0-Call Slot / Solver + OpenSearch / Split-Supervisor (≤4k tok) / Diagnostic Repair + Twin Shim / CPOP + Sister Distiller.

Enforced Category State Machine: cad_manufacturing_gate

Commit Invariant: Monotonic lease_epoch compare-and-swap fencing with content-addressed SWHID verification.

Architectural Problem Solved: Coordinates parallel execution without duplicate work or split-brain overwrites.

POST https://api.teleon.dev/v1/tenants/:tenantId/queues/aq55_audit_cot_faithfulness_and_divergence/enqueue
{
  "queue_category": "cad_manufacturing_gate",
  "priority": 80,
  "payload": { "stage": "55", "objective": "CoT Faithfulness Audit" }
}
← Stage 54: Conflict & Meta-Conflict View in Single-Page Master Blueprint Stage 56: Proof & Certificate Gate →